Thames Tideway Tunnel Consultation

A report from the Club Secretary, Terry:

The effects of any work on the tunnel are going to be along the stretch from Chiswick Mall through to East London at various points – it will affect Blades and the Putney Club more than Edge so not much to say until the work starts in 2013. The Club is monitoring the situation, but you can have your say: 
 
http://www.thamestunnelconsultation.co.uk/proposed-construction-sites.aspx

Bookmark and Share